Once you’ve made the decision to invest in solar panels for your business, you’ll likely be wondering about how the installation will happen. After all, it’s important to minimise disruption to your business operations, and we won’t blame you if you want your system up and running as soon as possible!

At Cerretti Electrical, we install solar panel systems for businesses across Scotland. In this blog, we’ll cover how the installation process happens so you know what to expect.

Want to find out something else about commercial solar panel systems? We have a wide range of blogs to read – find them at the button below!

Step One: Site Setup

Installation doesn’t happen right away, but once your installer has done a site survey, your system’s design has been finalised, all required permissions are in place and your application to your Distribution Network Operator (DNO) has been approved, your installation can begin. 

We will arrive at your site and begin setting up the necessary access equipment, which may include scaffolding. This is an essential step to ensure safe installation of your panels and the safety of our team. At this stage, we’ll also compile the necessary risk assessments and related paperwork.

Step Two: Mounting Your System and Loading Your Panels

Your installer will put in place the rails and frames that will hold your panels. This may be on your roof space or on the ground. This involves the use of power tools, which may be noisy. Your installer will do their best to minimise noise and disruption to your team and your neighbours during this stage.

Once the mounts are in place, your installers will then safely lift your panels onto the roof, or move them to the ground-mounted area, and securely attach them to their mounts. 

Step Three: Cabling and wiring

Now it’s time to hook your panels up to your inverter and to your main electrical distribution board. As an MCS-certified installer, we ensure this is done safely and in line with all regulations. If you’ve chosen to add battery storage, this will also be installed at this point in your chosen plant room or spot within your business premises. 

A shutdown of your electrical supply is usually needed here, so we would recommend scheduling this outside of business hours or having a contingency plan in place to limit disruption to your operations.

Step Four: Monitoring and Safety

Once everything is set up, your monitoring device will be installed, this lets you track how much energy your panels are generating and how much you’re using – much like a smart meter. We’ll also add all the necessary safety and warning labels as required by electrical regulations.

Step Five: Commissioning 

Commissioning ensures the system is safe, that it works as designed and is compatible with the grid connection. During this stage, we will check that everything is working properly and submit confirmation to the Distribution Network Operator (DNO), which in the north of Scotland is SSEN Distribution.  

Your installer will also show you how to use and monitor the system, and hand over all warranties, maintenance documents and manuals.

If you want to sell energy back to the grid, you can now set up your Smart Export Guarantee (SEG). Your installer will be able to assist you with this if you’re stuck.

How long does solar panel installation take?

You’ll want your system up and running soon, but every system is different, and it’s hard to say exactly how long an installation will take. Our team will provide an estimation and always keep you up to date along the way. Depending on the size of your system, the installation process itself could take anywhere from a few days to multiple weeks.