What Happens After Choosing Solar Panels: 7 Steps to Installation in Scotland

August 28, 2026 //
 4:40 pm

If you’ve decided to invest in solar panels for your home or business in Scotland, you’ve made a decision that not only has benefits for the environment, but will save you money on your bills and give you energy security in the long-term. 

With your decision made, you might now be wondering: How long will it take before my solar panels are up and running?

At Cerretti Electrical, we install solar panels in Aberdeenshire, Aberdeen and beyond, and we want to help you understand the process. That’s why we’ve written this simple guide to let you know what happens after you decide on solar panels, and how long you can expect to wait from confirmation to completion.

Want to find out more about solar panels?

How long does it take for my solar panels to be ready to use?

In general, you can expect to wait 10-12 weeks from the date you confirm that you’d like to go ahead with solar panels. That might seem like a long time, but it’s for good reason, and each stage is important in making sure your solar system is designed correctly, installed safely and ready to perform as it should for years to come. 

We’ve broken the process down step by step:

A mounted solar inverter and a battery storage unit are installed on a wooden wall inside a small utility room, with wiring, switches, and a document on the wall nearby. A window shows part of a house outside.

1. Final Checks from Your Local Solar Experts

Before we get started with your solar panel delivery, we make sure that all the design and tech elements of your solar panel system are correct. This is so we know that your solar panels will be effective and safe.

As MCS certified installers, safety and quality are of the most importance to the team at Cerretti Electrical, so this initial step is crucial to ensure that every other part of the installation process is up to the highest standards.

2. DNO Application

    After your system is designed, we submit a DNO application. You’re probably asking the question: what is a DNO application? The answer is simple – it’s a request to your local Distribution Network Operator (the company that owns the local electricity cables and infrastructure) for permission to connect your solar energy system to the grid. 

    The DNO will check that the local network can safely handle your solar energy system. For small systems, checks are almost immediate. For larger systems the checks can take 4-8 weeks.

    3. Ordering Your Solar System

      Once we’ve got approval from the DNO, we order your solar panels, battery storage and all of the other components we need to build your solar system. At Cerretti Electrical, we can install parts from a wide range of suppliers, including SolaX, DMECG Solar, Longi, Puredrive and Scame Electrical Solutions.

      This stage is where the longest wait can happen as quality solar parts are often in demand, and can be affected by global conflicts and supply chain issues, which is unfortunately out of our hands. We recommend allowing up to four weeks for your parts to be delivered, but we’ll let you know about any delays.

      4. Install Date Booked In

      Once we have your parts, we make sure that they are all functioning properly and ready to be installed on your roof.

      Now it’s time to book in your install! We’ll get in touch to book dates that suit you – we aim to cause as little disruption as possible and get your system installed within a week. As long as we can get access to the roof (or other surface the panels will be installed onto), you don’t even need to be home for us to set up your system.

      Three workers on a sloped roof install solar panel mounting frames. One person holds a solar panel, another kneels to secure it, while the third observes. They wear safety gear. Scaffolding and trees are visible in the background.

      5. Installing Your Solar Panels

      A member of our team will come to your home or business and start the installation. We believe that a quality installation is just as important as a quality solar system as it ensures that your solar panels don’t just function, but that they’re safe, efficient and will last longer. Cerretti are MCS certified, which is a testament to our high standards of workmanship and safety standards.

      Once we’re done we’ll pack away our equipment and remove any debris, leaving nothing but your shiny new solar panels and system!

      6. Safety Testing Solar Panels 

        Now we test your solar panels to make sure everything is working as expected. We take a look at the wiring, test the safety, and turn it on to make sure it safely connects to the grid. 

        This process is sometimes called “commissioning”, which is the technical term for doing the proper checks and tests before handing a system over to the customer. This part of the process should only take around an hour.

        7. Handover and How To Use Your Solar Panels

            Your solar panels are ready! Before we go we’ll tell you everything you need to know about how to use your new system, and if you have any questions after we leave we’re always a phone call or email away.

            Now you can enjoy better energy security and cheaper energy bills!

            Ready to Explore Solar?

            At Cerretti Electrical, we’ve helped dozens of home and business owners in Aberdeenshire and the rest of Scotland save money with solar panels. 

            We handle the process from start to finish, making solar simple and keeping you informed at every stage of your 10-12 week journey towards cheaper bills and more sustainable energy.

            Get in touch to find out more.